Whether it’s one cubic yard or more than 1 million, we handle all types of jobs.

Here are some of our projects:

  • A water treatment plant in Los Angeles County required 120,000 yards of temperature-controlled concrete.
  • One of Southern California’s most visited landmarks, the Huntington Beach Pier, was demolished and rebuilt with precast piles and 10,000 cubic yards of cast in place concrete.
  • The UCLA Medical Center added a nuclear cyclotron facility. The super dense concrete contained aggregates imported from Missouri.
  • The Burbank water reclamation plant attained very low shrinkage by using admixtures that reduced cracking for water containment structures. All tanks passed hydro static pressure tests on the first attempt.
  • The Metro Line tunnel from Universal City to Hollywood needed 120,000 cubic yards of concrete — 90,000 of which contained a high range water reducer.
  • The Los Angeles Convention Center expansion was required 140,000 cubic yards of concrete.
  • The 28th Street Marine Condominiums in Newport Beach used 6,620 yards in the mat foundation, and was completed in 12 hours.
  • The tallest building in downtown Los Angeles, the US Bank Building, used 6,500 cubic yards for its foundation and was poured in 17 hours.
© 2019 Copyright - Associated Readymix